Projects

Engineering works at the Naudin station, Paris, France

Location : Paris, France Mission : Reinforcement plans Client : VCF TP IDS – BET ISC Contracting owner : RATP Project management: SYSTRA Building company : SpieBatignolles,  Vinci Constrition France, Dodin Campenon Bernard, Botte Fondations, Spie Fondation Date : 2017-2018

view project

Extension of the port of Kingston, Jamaica, for CMA CGM

Location : Kingston, Jamaïque Mission : Reinforcement plans Client : Vinci Construction Maritime et Fluvial (VCMF) , Vinci Construction Grands Projets (VCGP) Contracting owner : CMACGM, Terminal Link (CMA CGM) Project management : EGIS Port Building company: VINCI Construction Grands Projets, VINCI Construction Maritime et Fluvial, Jan de Nul (dredging) Date : 2017- 2018

view project

Engineering works at the Bagneux station, Paris, France

Location : Paris, France Mission : Reinforcement plans Client : VCF TP IDS – BET ISC Contracting owner : Société du Grand Paris Project management: Groupement Setec, Ignérop Building company :  Vinci, Spie Date : project in progress since 2017

view project

Tribune for the president of Equatorial Guinea in Djibloho

Location : Oyala-Equatorial Guinea Assignment: Formwork and reinforcement plans Client : VCF TP IDF – BET ISC Contracting owner : République de Guinée Equatoriale Project management : VCF TP IDF – BET ISC Building company : SOGEA SATOM Date : 2015

view project

Wastewater treatment plant in Fontainebleau

Location : Fontainebleau-Avon- France Assignment : Formwork and reinforcement plans Client : VCF TP IDF – BET ISC Contracting owner : Community of Fontainebleau-Avon Project management : Group of SAFEGE, Hydratec, F.JESTAZ Building company : Group of DEGREMONT, BOTTE, SOBEA Environnement Date : 2011

view project

Bridge of Micoc Alum over the river Rio Wele

Location : Micoc Alum – Equatorial Guinea Assignment: Formwork and reinforcement plans Client : VCF TP IDF – BET ISC Contracting owner : République de Guinée équatoriale Project management : VCF TP IDF – BET ISC Building company : SOGEA SATOM Date : 2014 – 2015

view project

Parking Charcot

Location : Paris – France Assignment: Formwork and reinforcement plans Client : VCF TP IDF – BET ISC Contracting owner : SEMAPA Project management : Artelia Building company : Group of TPI/PETIT/Bottes Fondations Date : 2015 – 2016

view project

Aquapark Aqualagoon

Location : Villeneuve-le-Comte- France Assignment: Formwork and reinforcement plans Client : VCF TP IDF – BET ISC Contracting owner : Villages Nature Project management : Artelia, JFA, Interscène et C&E Building company : Group of Chantiers Modernes Construction (mandataire) and Arbonis Date : 2014 – 2016

view project

Reconstruction of the area of Les Halles, Paris

Location : Paris – France Assignment: Formwork and reinforcement plans, Assembly plans Client : VCF TP IDF – BET ISC Contracting owner : SemPariSeine Project management : GrontmiJ Building company : Group of GTM TP IDF, TPI, CM BTP Date : 2011 – 2015

view project

Sewage treatement plant in Kenya

Location : Kigoro – Kenya Assignment: Formwork and reinforcement plans Client : VCF TP IDF – BET ISC Contracting owner : State of Kenya Project management : Group of ARTELIA, CAPE CONSULT Building company : Group of SOGEA SATOM, SUEZ Date : 2016 – 2017

view project

Displacement of highway A9 – Montpellier

Location : Montpellier – France Assignment: Formwork and reinforcement plans Client : VCF TP IDF – BET ISC Contracting owner : ASF Project management : INGEROP Building company : Group of VCT, DCB, Razel-Bec, NGE, Eurovia, GTM Sud, Sogea Sud Date : 2014-2015

view project

Steel structure of RER B station Cachan

Location : Paris – France Assignment: Assembly plans Client : VCF TP IDF – BET ISC Contracting owner : Group of RATP,MOP,CDP Project management : Group of RATP/ING/OIT/TCE Date : 2015-2016

view project

Batignolles slab

Location : Paris – France Assignment: Reinforcement plans Client : VCF TP IDF – BET ISC Contracting owner : Paris Batignolles Aménagement Project management : OGI Building company : Group of TPI, Eiffage TP, Soletanche Bachy, Botte fondations Date : 2013

view project

Dam Vives Eaux

Location : Boissise le Bertrand – France Assignment: Formwork and reinforcement plans Client : VCF TP IDF – BET ISC Contracting owner : VNF Project management : Artelia Building company : Group of EMCC, GTM, DEMATHIEU et BARD, Ducrocq, Rouby Date : 2014 – 2015

view project

Passage for fish near Sauveterre on the river Rhône

The Passage for fish consists of several different parts.

view project

Overpass PS1 and PS2 near the third exit from the highway in Brazaville, Congo

We prepared all the necessary plans from the beginning of the project.

view project

Second bridge over the Wouri River in Douala, the economic capital of Cameroon

The bridge is done in two parts – road and railway bridge.

view project

Trench for a new pipeline of international airport in Brazzaville, Congo

Over this pit pass five footbridges venturing into 5 single foundations.

view project

Dock N 2 “Quai Anse-Saint-Marc” at the la Rochelle, France

The project is part of the expansion of the quay Anse Saint-Marc and its purpose is to expand the capacity of the port Grand Port Maritime de la Rochelle.

view project

Tunnels for renovation of Chatelet subway station, Paris

The task of Kreyo was to draw the formwork and reinforcing plans, as well as the plans for strengthening of the excavations.

view project

Bridge of town of Mongomo in Equatorial Guinea

Kreyo started work on the project from the very beginning – from the first formwork plan to the very last detail.

view project

Distribution center for the Ciments CALCIA

The cement plant Ciments Calcia is situated in ZAC Paris Rive Gauche part of district 13 in Paris.

view project

Storm/rain water tank of the sewage treatment plant – STEP Le Carre de Reunion, France

Part of the extension and modernization of the sewage treatment plant Le Carre de Reunion.

view project